61-18OCT05 Grading
MKT Trail |
|
Mobilization |
Blacktop Paving |
|
a |
b |
c |
d |
e |
|
Equipment |
Estimated Events per Year |
Mileage – Round-trip to MKT Trail |
$ per mile |
Total $ (b x c x d) |
|
Motor
Grader |
2 |
38 |
$4.85 |
$368.60 |
|
Tractor
w/8’ Box Blade |
2 |
38 |
$4.00 |
$304.00 |
|
Compaction
Roller |
2 |
38 |
$4.00 |
$304.00 |
|
Backhoe |
1 |
38 |
$4.00 |
$152.00 |
|
Skid
Steer Loader Case 90XT |
1 |
38 |
$3.75 |
$142.50 |
|
Bobcat |
1 |
38 |
$3.75 |
$142.50 |
|
CAT D-5
Dozer/Loader |
1 |
38 |
$4.00 |
$152.00 |
|
Single
Axle Dump Truck (8-9 ton loads) |
1 |
38 |
$4.00 |
$152.00 |
|
Tandem
Axle Dump Truck (14-16 ton loads) |
1 |
38 |
$4.00 |
$152.00 |
|
Flatbed
Single Axle Dump Truck (5-7 ton loads) |
1 |
38 |
$4.00 |
$152.00 |
|
One Ton
Dually Flatbed Dump Truck (2-3 ton loads) |
1 |
38 |
$3.75 |
$142.50 |
|
|
|
Total $ for Mobilization
$_______________ |
$2,164.10 |
|
|
|
|
|
|
|
Hourly
Rates: |
|
|
|
|
|
a |
b |
c |
d |
e |
|
Equipment |
Estimated Hours per Year |
Standard Rate $/hour (equipment
w/operator) |
Premium Rate $/hour (equipment w/operator) |
Total $ (b x c) |
|
Motor
Grader |
32 |
$85.00 |
$95.00 |
$2,720.00 |
|
Tractor
w/8’ Box Blade |
32 |
$60.00 |
$70.00 |
$1,920.00 |
|
Compaction
Roller |
32 |
$45.00 |
$55.00 |
$1,440.00 |
|
Backhoe |
8 |
$65.00 |
$75.00 |
$520.00 |
|
Skid
Steer Loader Case 90XT |
8 |
$65.00 |
$75.00 |
$520.00 |
|
Bobcat |
8 |
$50.00 |
$60.00 |
$400.00 |
|
CAT D-5 Dozer/Loader |
8 |
$85.00 |
$95.00 |
$680.00 |
|
Single
Axle Dump Truck (8-9 ton loads) |
8 |
$50.00 |
$60.00 |
$400.00 |
|
Tandem
Axle Dump Truck (14-16 ton loads) |
8 |
$60.00 |
$70.00 |
$480.00 |
|
Flatbed
Single Axle Dump Truck (5-7 ton loads) |
8 |
$50.00 |
$60.00 |
$400.00 |
|
One Ton
Dually Flatbed Dump Truck (2-3 ton loads) |
8 |
$40.00 |
$50.00 |
$320.00 |
|
|
Total $ for labor and equipment $_____________ |
|
|
|
$9,800.00 |
|
|
|
|
|
TOTAL
PRICE ALL WORK: $_________________ |
$ 11,964.10 |
|
Statement of Bidder’s Qualifications Included? |
YES |
|
% Increase 2nd Contract Period |
5% |
|
5% |
% Increase 3rd Contract Period |
5% |
|
COOP |
YES |
|
|
|
No Bids |
|
S & C
Bridge & Concrete, Inc. |
|
|
|
|
|
|
|
|