Bid Tabulation 61-18OCT05    
Bid Tab 
61-18OCT05 Grading MKT Trail
Mobilization Blacktop Paving
a b c d e
Equipment Estimated Events per Year Mileage – Round-trip to MKT Trail $ per mile Total $ (b x c x d)
Motor Grader 2 38 $4.85 $368.60
Tractor w/8’ Box Blade 2 38 $4.00 $304.00
Compaction Roller 2 38 $4.00 $304.00
Backhoe 1 38 $4.00 $152.00
Skid Steer Loader Case 90XT 1 38 $3.75 $142.50
Bobcat 1 38 $3.75 $142.50
CAT D-5 Dozer/Loader 1 38 $4.00 $152.00
Single Axle Dump Truck (8-9 ton loads) 1 38 $4.00 $152.00
Tandem Axle Dump Truck (14-16 ton loads) 1 38 $4.00 $152.00
Flatbed Single Axle Dump Truck (5-7 ton loads) 1 38 $4.00 $152.00
One Ton Dually Flatbed Dump Truck (2-3 ton loads) 1 38 $3.75 $142.50
          Total $ for Mobilization $_______________ $2,164.10
         
Hourly Rates:        
a b c d e
Equipment Estimated Hours per Year Standard Rate $/hour (equipment w/operator) Premium Rate $/hour (equipment w/operator) Total $ (b x c)
Motor Grader 32 $85.00 $95.00 $2,720.00
Tractor w/8’ Box Blade 32 $60.00 $70.00 $1,920.00
Compaction Roller 32 $45.00 $55.00 $1,440.00
Backhoe 8 $65.00 $75.00 $520.00
Skid Steer Loader Case 90XT 8 $65.00 $75.00 $520.00
Bobcat 8 $50.00 $60.00 $400.00
CAT D-5 Dozer/Loader 8 $85.00 $95.00 $680.00
Single Axle Dump Truck (8-9 ton loads) 8 $50.00 $60.00 $400.00
Tandem Axle Dump Truck (14-16 ton loads) 8 $60.00 $70.00 $480.00
Flatbed Single Axle Dump Truck (5-7 ton loads) 8 $50.00 $60.00 $400.00
One Ton Dually Flatbed Dump Truck (2-3 ton loads) 8 $40.00 $50.00 $320.00
                                                           Total $ for labor and equipment $_____________       $9,800.00
        TOTAL PRICE ALL WORK: $_________________  $          11,964.10
 Statement of Bidder’s Qualifications Included?  YES
% Increase 2nd Contract Period 5%
5%
% Increase 3rd Contract Period 5%
COOP YES
 
No Bids
S & C Bridge & Concrete, Inc.