BID TABULATION |
|
|
|
42-23JUN05
Dry Storage Building Maintenance Improvements |
|
|
|
|
|
|
Septagon Constructin Co
Inc. |
|
4.7 |
Bid Response |
|
|
|
Total
lump sum bid for painting of primary structural steel components; patch
taping all damaged insulation and installation of liner panel in BCPW
Dry Storage Building located at the
south facility. |
$165,000.00 |
|
4.7.1 |
Bid Alternate No. 1 |
|
|
|
Bid Alternate No. 1 shall
include cleaning, repriming where needed and painting all primary structural
steel racks supporting the truck bed accessories located adjacent to the Dry
Storage Building. |
$14,950.00 |
|
4.7.2 |
Bid Alternate No. 2 |
|
|
|
Bid Alternate No. 2 includes all
surface preparations, primer, and painting of wall girts. |
$10,120.00 |
|
4.7.3 |
Bid Alternate No. 3 |
|
|
|
Bid Alternate No. 3 shall
include cleaning, repriming where needed and painting all primary structural
steel racks supporting the truck bed accessories located adjacent to the Dry
Storage Building. |
$8,510.00 |
|
|
|
|
|
|
Voluntary Alt #1 |
|
|
|
Supply
and install Rufco 400 high density polyethylene sheeting in lieu of the metal
liner panel over the purlin's. (See attached product data). This material would be applied to the
purlin's using double sided tape and then banded and screwed to the purlin's
for additional support. |
Deduct from base bid:
$48,000.00 |
|
|
|
|
|
|