Bid
Tabulation |
|
|
|
|
|
|
|
|
|
53-03AUG03 -
Dee Woods Right Of Way Restoration Project |
|
|
CL Richardson Const.
Co. |
|
|
|
5.1. |
Description of
Work |
Unit of Measure |
Units |
Unit Price |
Cost |
|
|
|
|
|
|
|
Mobilization |
LS |
1 |
1500.00 |
$
1,500.00 |
|
|
|
Add
fill dirt as needed to fill in channel, eroded areas and bring up level to
edge of roadway, Lime, fertilize, seed & place erosion fabric centered on
flow line. Mulch remaining areas. |
SY |
2672.5 |
4.00 |
$ 10,690.00 |
|
|
|
Alternate
Bid- Add fill dirt as need to fill in channel, eroded areas
and bring up level to edge of roadway. Lime, fertilize, seed, & place
erosion fabric centered on flow line, Mulch remaining areas. |
SY |
1593.1 |
4.00 |
$ 6,372.40 |
|
|
|
Prepare
for over seeding in majority of area. Add top soil to all eroded areas &
bring up level with edge of roadway. Will require minor re-grading. Lime,
fertilize, seed & mulch. |
SY |
3812.6 |
3.50 |
$ 13,344.10 |
|
|
|
Add fill dirt to channel. Add dirt to channel.
Add top soil to areas on slopes & Bring up level to edge of roadway.
Lime, fertilize, seed & Place erosion fabric centered on flow line. Mulch
remaining areas. |
SY |
3116.4 |
4.00 |
$ 12,465.60 |
|
|
|
Re-grade.
Add Dirt to channel. Add top soil to areas on slopes & bring up level to
edge of roadway. Lime, fertilize, seed, & place erosion fabric centered
on flow line |
SY |
1913.5 |
4.00 |
$ 7,654.00 |
|
|
|
Add
fill dirt width of fabric x 3" depth. Lime, fertilize, seed & place
erosion fabric along edge of roadway. |
SY |
172.3 |
4.00 |
$ 689.20 |
|
|
|
Type
1 Rock Blanket Placement |
CY |
182 |
30.00 |
$ 5,460.00 |
|
|
|
Recover
Rock Blanket, Place & Grout |
LS |
1 |
2200.00 |
$ 2,200.00 |
|
|
|
Placement
of Grout on Rock Blanket |
SY |
39 |
22.00 |
$ 858.00 |
|
|
|
Placement
of Additional Erosion Control Fabric |
SY |
36 |
5.00 |
$ 180.00 |
|
|
|
15"
CMP Installation w/ 3:1 miter included |
LF |
4 |
160.00 |
$ 640.00 |
|
|
|
18"
CMP Installation w/ 3:1 miter included |
LF |
6 |
125.00 |
$ 750.00 |
|
|
|
21"
CMP installation w/ 3:1 miter included |
LF |
12 |
90.00 |
$ 1,080.00 |
|
|
|
Mailbox
Relocation |
LS |
1 |
350.00 |
$ 350.00 |
|
|
|
Total |
|
|
$
64,233.30 |
|
|
|
|
Statement of Qualifications |
Yes |
|
|
|
Anti-Collusion Statement |
Yes |
|
|
|
Signature & Identity of Bidder |
Yes |
|
|
|
Bidder's Acknowledgement |
Yes |
|
|
|
Bid Bond |
Yes |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|